Automation Design Review Checklist: Before You Build the Machine

The Machine That Was Built Before the Design Review: Why Reviews Matter A machine built by a small team. They skipped the design review (they were behind schedule). They built it. During commissioning, they found three major errors: a guard that blocked the operator’s access, a valve that was mounted where maintenance couldn’t reach it, …

E-Stop Reset Circuit: Manual Monitored Reset and Safety Monitor Relay

The E-Stop That Restarted Automatically: Safety Circuit Reset Logic, Not the Relay An e-stop button pressed. The machine stopped. Two seconds later, it restarted on its own. The customer thought the safety relay was defective. The relay was fine. The PLC logic was wrong — it automatically reset the safety circuit. This is about safety …

Pneumatic Press Design: Riveting Force Curve, Cylinder Sizing and Monitoring

The Rivet That Wasn’t Setting Properly: Rivet Gun Setup, Not the Rivets A pneumatic rivet gun setting blind rivets. The rivets weren’t flaring properly — some were loose, some were over-set. The customer thought the rivets were defective. The rivets were fine. The gun wasn’t adjusted. This is about rivet gun setup, not about the …