Automation Design Review Checklist: Before You Build the Machine
The Machine That Was Built Before the Design Review We built a machine on a tight schedule. The design review (a meeting where the team checks the design) got skipped — “we’ll review it during build.” On the floor, problems surfaced: a cylinder that didn’t reach its stroke, a sensor in a spot the operator …
Continue reading “Automation Design Review Checklist: Before You Build the Machine”